Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3354

Re: Reversal of GRN & Inspection lot BEFORE QM

$
0
0

Hi,

   If the lot is created automatically through delivery / material document, the lot will be automatically cancelled once the origin doc is cancelled and the lot status will be LTCA. Please go through the help doc: Cancellation of an Inspection Lot - Inspection Lot Creation - SAP Library

   The inspection lot will be still displayed in QA32 / QA33. If you want to remove it from QA32 list, you may refer the thread: How to remove canceled inspection lot from QA33? | SCN

   If you still think there is inconsistency, refer the note: 48815 - Checking possible inconsistencies between MM and QM

 

Regards,

AKPT


Viewing all articles
Browse latest Browse all 3354

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>