Dear GovindRaj
Points I posted earlier were in the context of Non SLED batch environment.
As you mentioned that you have SLED Batch materials, then can you please check below additional points
Have you setup SLED in correctly already (Check Batch mgmt>>SLED in SPRO).
Do batches contain expiration date or not ?
Do quants of those batches contain expiration date or not (LQUA-VFDAT)?
Min Shelf life and total shelf life have been maintained in Material plant /st data 1 view?
In your TR whether you have field VFDAT filled or not ? Though this is not a Must.
Did you activate SLED for whse in SPRO>>Stock removal strategies ?
Do you have defined and assigned sort sequence in batch search strategy in WM ?
Though SAP allows both FIFO and SLED stock removal strategy for SLED material , have you checked possibility of just SLED stock removal stategy(H) only ?
If you have already rejected this , what led you to reject it ?
Would need more details on SLED side from Material master and st type definition from system.
Finally , you may also refer note SAP Note 769036 (I would not directly suggest it without checking existing setup correctness and also due to symptom for this note being more generic ,I believe)
As system details are not explicitly available , it is bit difficult to pinpoint exact root cause and also applicability of this note.
Regards,
Ajay