Hi karthik,
There should be a business need when you create alternate BOM for example with base qty component qty changes. With time validity component changes.
When we create alternative BOM, we have to link them with the production version as per lot size or the validity.
Refer the link . https://sap.scn.com/thread/3236019
Thanks
kishan